Navigation menu

Mk II Bridge: Difference between revisions

From Metroid Wiki
mNo edit summary
mNo edit summary
Line 1: Line 1:
[[file:Mk II Bridge 01.png|thumb|right|250px|An Mk II Bridge being lowered.]]
[[file:Mk II Bridge 01.png|thumb|right|250px|An Mk II Bridge being lowered.]]
The '''Mk II Bridge''', the standard '''GF Bridge''' model used during the events of ''[[Metroid Prime 2: Echoes]]'', is a portable bridge system of [[Galactic Federation]] design.<ref>{{cite|Mechanism: Mk II Bridge<br>Portable bridge system.|Scan Data|[[Metroid Prime 2: Echoes]]}}</ref> The [[GFMC Task Force Herakles]] set one up in the [[Industrial Site]] of the [[Temple Grounds]] on [[Aether]] after they crash landed there. [[Samus Aran|Samus]] can lower the bridges by disengaging and destroying the [[Armored Security Lock]]s holding them upright. Though durable, the bridge design is flawed and it will often lock in place. Because of this the [[Galactic Federation Marine|Marines]] made plans to release the new and improved [[Mk III Bridge]].<ref name=logbook>{{cite|This bridge is durable, but often locks in place, leading the Marines to call for a new design. The Mk III should enter service within the next eight cycles.|[[Metroid Prime 2: Echoes Logbook|Logbook]] Data|[[Metroid Prime 2: Echoes]]}}</ref>
The '''Mk II Bridge''', the standard '''GF Bridge''' model used during the events of ''[[Metroid Prime 2: Echoes]]'', is a portable bridge system of [[Galactic Federation]] design.<ref>{{cite|Mechanism: Mk II Bridge<br>Portable bridge system.|Scan Data|[[Metroid Prime 2: Echoes]]}}</ref> The [[GFMC Task Force Herakles]] set one up in the [[Industrial Site]] of the [[Temple Grounds]] on [[Aether]] after they crash landed there. [[Samus Aran|Samus]] can lower the bridges by disengaging and destroying the [[Armored Security Lock]]s holding them upright. Though durable, the bridge design is flawed and it will often lock in place. Because of this the [[Galactic Federation Marine|Marines]] made plans to release the new and improved [[Mk III Bridge]].<ref name=Logbook/>


{{clear}}
{{clear}}
Line 6: Line 6:
{{logbook
{{logbook
|name=GF Bridge
|name=GF Bridge
|entry=This bridge is durable, but often locks in place, leading the Marines to call for a new design. The Mk III should enter service within the next eight cycles.
|entry=This bridge is durable, but often locks in place, leading the Marines to call for a new design. The Mk III should enter service within the next eight cycles.<ref name=Logbook>{{cite|This bridge is durable, but often locks in place, leading the Marines to call for a new design. The Mk III should enter service within the next eight cycles.|[[Metroid Prime Logbook]] "GF Bridge"|Metroid Prime}}</ref>
|game=mp2
|game=mp2
|location=
|location=

Revision as of 16:58, 18 April 2012

An Mk II Bridge being lowered.

The Mk II Bridge, the standard GF Bridge model used during the events of Metroid Prime 2: Echoes, is a portable bridge system of Galactic Federation design.[1] The GFMC Task Force Herakles set one up in the Industrial Site of the Temple Grounds on Aether after they crash landed there. Samus can lower the bridges by disengaging and destroying the Armored Security Locks holding them upright. Though durable, the bridge design is flawed and it will often lock in place. Because of this the Marines made plans to release the new and improved Mk III Bridge.[2]

Logbook

Logbook entry from Metroid Prime 2: Echoes: GF Bridge
This bridge is durable, but often locks in place, leading the Marines to call for a new design. The Mk III should enter service within the next eight cycles.[2][2]

Gallery

References

  1. "Mechanism: Mk II Bridge
    Portable bridge system.
    " —Scan Data (Metroid Prime 2: Echoes)
  2. 2.0 2.1 2.2 "This bridge is durable, but often locks in place, leading the Marines to call for a new design. The Mk III should enter service within the next eight cycles." —Metroid Prime Logbook "GF Bridge" (Metroid Prime) Cite error: Invalid <ref> tag; name "Logbook" defined multiple times with different content